What started in the dream stage (planning stage) a year ago, is finally  coming together. This week we had what is know as a "rough in" inspection . The plumbing, wiring, roofing, framing, and air conditioning were all checked out on this single inspection. We passed :0)
Now we can have the house insulated which began today.
IN addition, the plumber hooked up the sewer line and water supply so we now have a pressurized system.

We spent the day beginning work on beadboard walls in the hallway and bathrooms.

Also finished off wiring the panel box and installing circuit breakers.



The finale, was installing a temporary toilet (with running water :0)
This will be pulled out when the floor tile arrives


We also had the shower pans (waterproof membranes) added and will do a concrete sloping pad next week to prepare the shower for tile.


While the insulation people were here, the drywall truck pulled up. When it rains it pours.
THey offloaded 120 4x12 sheets of drywall which can now be installed over the insulated walls.

3 comments:

  1. Looking good. Can't wait to see the final photos.
    Jon

    ReplyDelete
  2. Yeah...it's coming along, looking good. Can't wait till y'all get to the fun part...painting and decorating :-) Love y'all and miss y'all!!! See ya when we get home!!!

    ReplyDelete
  3. Some have the vision, some the talent and some the execution.
    You guys have the trifecta! Looking great
    bbb

    ReplyDelete