Thursday, January 15, 2015

Adding trim details

With Christmas and family visiting in West Palm Beach, I have taken a little time off from updating the blog, but not from working on projects around the house. Over the Christmas Holidays we had the pleasure of a visit from my daughter Sandra and her husband J.W.   He and I had a chance to work together for a few days doing trim work and installing base cabinets and hooking up the dishwasher. This was all in preparation for the countertops which have been ordered.

First we leveled and anchored the cabinets to the wall and installed the dishwasher.

Here is a view of the dishwasher hookup. It hurt a little bit to cut a 2" hole in a brand new cabinet.


Here are a few pictures of the hallway and doorway trim. Much more to do, but a good start. We are duplicating the original door trim style from the period when the house was built.
Using a chair rail molding to separate the beadboard from the plastered walls in the hallway.

Trim around pantry door

                                                   Trim around guest bedroom door
                                                  Trim around the caretaker's bedroom  :0)
          Trim around the 4' hallway that connects the living room in the front of the house to the kitchen/dining/office area in the back of the house.







Friday, December 5, 2014

Starting to add details

Starting to add details with a house is very much like a painting. You begin with an idea, the beginning appears like chaos, form eventually takes place, but the details are what brings it to life.

Added pendant lights over the kitchen farmhouse sink.


Added one of my favorite stained glass creations as a hanging dining room light. About 1,400 pieces of glass in this one . You can see our two kayaks temporarily stored on saw horses out back.

Put the finishing touches in the laundry area just in time for delivery of our washer and dryer tomorrow. Julie will think Christmas came early :0)
These are two of the four louvered doors that will hide the washer and dryer and match all of the other louvered interior doors we have throughout the house.

Also had our  gas stove delivered so we were able to install some of the kitchen cabinets and range hood. At the same time the refrigerator was delivered. The wood counter tops are temporary while Julie decides what counter top material she would like. Starting to feel like home.

The green antique screen door shown below is the entrance to the walk in  pantry.

We also added three vintage "barnhouse lights" for general kitchen lighting.


Finally got around to hanging some art . Looks better than gray drywall.
Added some copper pendant lamps in the living room for general lighting.
Still working on finishing the drywall. Not hard, but time consuming and satisfying.
This was an old dresser we found in Ocala  that was quite rough. Julie sanded , primed and painted it after I cut the hole in the top for the sink. We both love the vintage look this adds to the guest bathroom. Still needs paint on the mirror frame. 










Sunday, November 16, 2014

kitchen ceiling, new shower, front porch light and moving in

It has been a busy few weeks. We moved all of our furniture and "stuff" out of our home in Salt  Springs anticipating a November 17th closing. Although it is not finished, we  have moved into our cottage. The necessities are there but it remains a long way from being finished.

                                 The moving crew, Julie, brother Mike and son in law JW.


One necessity was to have a finished bathroom. To keep in the theme of a 100 year old beach cottage, we chose small white hexagon tiles for the floor and small subway tiles for the shower walls. A single row of light green sea glass tiles in the shower helps to keep the white from getting monotonous. The glass is bordered by a rope tile.
Here is Julie grouting the shower floor
Next was tiling and grouting the bathroom floor
We then put our efforts into putting some finishing touches in the kitchen. The beams are 2x10's. After the foam insulation was sprayed in, there was a bit over 4 inches of exposed wood remaining which we covered with a bead board material.
Also added some light fixtures above the bed for reading

I received an early Christmas gift from my mother and brother. This new found  (but not new) bronze front door light fixture as salvaged from a ship.




Thursday, October 16, 2014

Rough In Inspection

What started in the dream stage (planning stage) a year ago, is finally  coming together. This week we had what is know as a "rough in" inspection . The plumbing, wiring, roofing, framing, and air conditioning were all checked out on this single inspection. We passed :0)
Now we can have the house insulated which began today.
IN addition, the plumber hooked up the sewer line and water supply so we now have a pressurized system.

We spent the day beginning work on beadboard walls in the hallway and bathrooms.

Also finished off wiring the panel box and installing circuit breakers.



The finale, was installing a temporary toilet (with running water :0)
This will be pulled out when the floor tile arrives


We also had the shower pans (waterproof membranes) added and will do a concrete sloping pad next week to prepare the shower for tile.


While the insulation people were here, the drywall truck pulled up. When it rains it pours.
THey offloaded 120 4x12 sheets of drywall which can now be installed over the insulated walls.

Saturday, October 4, 2014

Cabinet for above built in refrigerator

This past week has had a different feeling. We are waiting for the plumber to finish his "rough in" work so  we can get past our first inspection  which will be for electrical, framing, roof, plumbing, and air conditioning. This has to be done to go on to insulation and drywall.
WE have run out of jobs to do which will get us closer to moving in and are now looking for things to do.

We had an extra salvaged louvered door that had a slight bow to it, and decided to cut it in half to create a louvered cabinet door for above the built in refrigerator. This will help tie the kitchen area in with the rest of the house which has louvered doors throughout.

Starting off with an older louvered door.
Here is how it looked after cutting through the center and taking a bit off of the bottom
We then went to the appliance store and found that standard height of a modern refrigerator is 6 feet. Framed in the refrigerator opening and created a shelf and braces for the louvered door.
Used standard door hinges to mount the newly created louvered cabinet door.

This will be a nice large storage area for those items that are seldom used.






Wednesday, October 1, 2014

Dresser for guest bath vanity

We picked up a vintage dresser with a really neat mirror. The dresser's wood was old, tired , fades  and neglected. A perfect candidate for paint and a bathroom sink conversion.
Here are a few pictures of the conversion process.




Here is Julie putting a coat of primer on the dresser after a light sanding

The drawers are being modified to accommodate the plumbing.